
Asfinag bridge inspections 2014, Austria
Project description
This job included a total of 106 bridge inspections along autobahns and expressways in Austria.
In each case, the following were examined and evaluated: The substructure, the superstructure, the bearing and joints, road transitions (if any), the road surface, the sealing, drainage, edge beams, and any other parts of the bridges.
The bridges are located along four different roadways:
Six bridges along the S37 Klagenfurter expressway
43 bridges along the A10 Tauern Autobahn
39 bridges along the A2 South Autobahn
18 bridges along the A11 Karawanken Autobahn
In each case, the following were examined and evaluated: The substructure, the superstructure, the bearing and joints, road transitions (if any), the road surface, the sealing, drainage, edge beams, and any other parts of the bridges.
The bridges are located along four different roadways:
Six bridges along the S37 Klagenfurter expressway
43 bridges along the A10 Tauern Autobahn
39 bridges along the A2 South Autobahn
18 bridges along the A11 Karawanken Autobahn
Project information
Client
Asfinag, Wien, Austria
Our services
Brückenprüfungen laut RVS 13.03.11
Contact person
Dipl.-Ing. Walter Weis B.Sc.
Asfinag, Wien, Austria
Our services
Brückenprüfungen laut RVS 13.03.11
Contact person
Dipl.-Ing. Walter Weis B.Sc.
Photocredits
Bergmeister