Asfinag bridge inspections 2015 , Austria
Project description
This job included a total of 82 bridge inspections along autobahns and expressways in Austria.
In each case, the following were examined and evaluated: The substructure, the superstructure, the bearings, road transitions (if any), the road surface, the sealing, drainage, edge beams, and any other parts of the bridges.
The bridges are located along four different roadways:
7 bridges along the S37 Klagenfurter expressway
2 bridges along the A10 Tauern Autobahn
66 bridges along the A2 South Autobahn
7 bridges along the A11 Karawanken Autobahn
In each case, the following were examined and evaluated: The substructure, the superstructure, the bearings, road transitions (if any), the road surface, the sealing, drainage, edge beams, and any other parts of the bridges.
The bridges are located along four different roadways:
7 bridges along the S37 Klagenfurter expressway
2 bridges along the A10 Tauern Autobahn
66 bridges along the A2 South Autobahn
7 bridges along the A11 Karawanken Autobahn
Project information
Client
Asfinag, Wien, Austria
Our services
Bridge inspection in accordance with RVS Guidelines and Ordinances for Street Construction 13.03.11
Contact person
Dipl-Ing. Walter Weis B.Sc.
Asfinag, Wien, Austria
Our services
Bridge inspection in accordance with RVS Guidelines and Ordinances for Street Construction 13.03.11
Contact person
Dipl-Ing. Walter Weis B.Sc.